Independent Land Surveyor in Dubai U.A.E
Daily Basis Hiring of Independent Surveyor In Dubai
There are many types of construction works that can be done by land surveyors. In example of you have a small villa construction on going you want to shift elevations from one place to another. Or if you already got the points for plot limit and now you want layout of building footings columns marking etc. You may want to fix some grid lines in building openings in slabs lift core wall marking slab curves and there's a lot of works that can be done by independent surveyors. Also, it costs you very small amount in exchange of important work on going on your project.
In Dubai most buildings are designed with beautiful shapes and curves. These types of work only can be done by land surveyors using their instruments like total station theodolite and GPS (global position system). Measurements of angles distance and vertical alignments are important in designs when you are building these types of villas or any high-rise tower. High rise buildings and towers is another level of work that can be done only by surveyor using the total station and theodolite etc.
A surveyor is important in any ongoing construction site who gives all the marking and layout the whole design as per sketches given by the client. From start to end it is the surveyor who do all these layouts and give them marking in order to make it as per design requirements.
Also while making the building all underground services like sewerage pipelines electrical cables firefighting lines should be recorded for future to figure out them again if you want to redesign something. Sometimes when client changes the designs you may need to excavate the area and before starting excavation you need to plot lines underground in order to not broke them.
Interior Work in Buildings
Interior works inside the building is most important to make it as per drawing. When you want to make interior walls layout you must follow grid lines and other references given by surveyor. If you don't follow all the work and layout will be disturbed. Also, interior work is most important surveying details you need from surveyor to provide you before starting the finishing works. While fixing tiles and doing prime coats on slab you need level reports taken by surveyor. After looking this report, you know the situation of floor whether the level is correct or not.
An independent surveyor can come to the site even if you have 2 hours of survey work. Instead of doing surveyor markings on your own better to hire an independent surveyor who can give accurate markings and then proceed your work.
Are you looking for independent surveyor? if you are looking for an independent surveyor for any type of survey marking plot limit markings with GPS system feel free to contact us.
Some works in buildings are important and they are having less tolerance. Anchor bolt fixing alignment of columns walls. Fixing different structure in different places at many places and checking the plumbness and alignment of concrete panels. All these types of works are important. Fixing them in correct place and exact elevations. given in the drawings. Corridor marking with curve shapes at different places is also most important work.
Construction Buildings Tolerance
A tolerance is least number of any work that is adjustable or acceptable. The tolerance describes you or clearly sign that showing you least or maximum distance you can work around. If you exceed the tolerance, you may face issues while installing other things close to or onto it. Exceeding the tolerance is same as you cannot proceed the next procedure in there. For example, you are fixing anchor bolts that are having distance 5 meter in between and the tolerance given is 5mm.This means the structure plates that you will install on. these bolts having 5mm play around it. Now if you fix both anchor in 5. 020.Now the required distance and structure that is already fabricated can be fixed only if you have maximum 5mm difference otherwise you have to re do the anchor bolts or fabricate the structure as per the distance you have for anchor bolts on site.